The four-phase project was particularly challenging because we were working in tight time windows during traffic disruptions on Finland’s busiest railway line and at a traffic location between Helsinki Central Station and Pasila Station.
A special feature of the project was the relatively rare replacement of the adapted track crossing.
The contractor was the Finnish Transport Infrastructure Agency, and the contract period was 6-11/2024.