RENOVATION OF HAILIKARI QUAY IN HAMINA
Kreate carried out the renovation work on Hailikari quay in Hamina.
The contract was carried out by Kreate’s foundation and engineering construction unit in cooperation with KFS Finland’s bore piling unit. In the contract, the old quay was renovated and expanded. The renovation works included the demolition of the old quay structures; the construction of a new sheet pile wall around the quay; the installation of anchoring elements; and bore piling. In addition, a 1/5 extension was made as a continuation of the old quay. An edge slab was cast on top of the new sheet pile wall, half above water.
In this interesting project, water was nearby and affected many work phases as well as safety. Several work steps had to be done underwater, and the fluctuation in the sea level brought its own challenges to the work. Dismantling the old support structures to make way for the new ones was also challenging because there were no precise plans for the old structure. Special attention was paid to both the disassembly sequence and the installation of the anchors.
The contract implementation time was from May 2020 to September 2020.

Status
Completed
Category
Address
Hailikarintie, Hamina
Completion
09/2020
Project manager
Mika Seppälä
Project personnel
Position
Name
Phone
Construction Manager
Mika Seppälä
+358 50 316 0707
mika.seppala@kreate.fi
Responsible Site Manager
Vesa Penttinen
+358 50 322 9481
vesa.penttinen@kreate.fi
Similar projects

Status
Ongoing
THE UNIQUE CROWN BRIDGES PROJECT BUILDS FINLAND’S LONGEST AND TALLEST BRIDGE IN HELSINKI
09/2025

Status
Ongoing
HELEN’S EIRANRANTA HEAT PUMP PLANT ABOVE-GROUND FOUNDATION AND CONSTRUCTION WORK IN HELSINKI
08/2025