The construction project taken on by our foundation and engineering construction specialists includes an embankment constructed between wharfs 1 and 4 that rises 2.10 metres above sea level and extends to 520 metres in length as well as a collection system for rainwater that is built behind the embankment. The contract also includes improving the protection of steel structures as well as the lighting and making modifications in order to improve the launching of work boats from the port and their working conditions.

We planned the execution of the location in cooperation with the client and a design partner, taking into account the varying soil conditions in the area. Our strong expertise in the execution of demanding concrete structures and engineering structures in water can be seen in how, for example, we are using three types of structures for the embankment: A part of the wall will be cast in situ, another part consists of elements and a third part will be a combination of bored piles and sheet piles. The combination wall will be executed by KFS Finland Oy, Kreate’s joint venture that specialises in special foundation construction.

The purpose of the embankment is to prevent the products from a possible oil spill or pipe break from being carried into the sea, or from sea to land, and to manage the detrimental impacts of sea level changes and flooding. The embankment also allows for earlier detection and isolation of any possible leaks.

The location will be constructed on the terms of busy boat traffic, in collaboration with the port personnel. This ensures disturbance-free operation at Finland’s largest port in terms of tonnage that is located in the Kilpilahti industrial district, the largest concentration of chemistry industry activities in the Nordic countries. We are also considering the bird nesting period pursuant to the water permit and will not be performing pile driving that generates noise during this time, for example.

The client for the contract is Neste Oyj and the contract schedule is from 03/2023 to 06/2024.

Kreate rakentaa ympäristöturvallisuutta lisäävän rantamuurin Nesteen Porvoon satamaan.

Status

Ongoing

Category

Address

Kilpilahti, Porvoo

Completion

06/2024

Project Leader

Mika Seppälä

Project personnel

Position Name Phone Email
Construction Manager Mika Seppälä 050 316 0707 mika.seppala(a)kreate.fi
Worksite Manager Vesa Penttinen 050 322 9481 vesa.penttinen(a)kreate.fi

Articles

Kreate has signed an agreement for the development stage of the alliance contract for the Kirjalansalmi and Hessundinsalmi bridges, one of the most demanding bridge projects in Finland

The Finnish Transport Infrastructure Agency and Kreate have signed the development stage alliance agreement for the Highway 180 Kirjalansalmi and Hessundinsalmi bridge renovation project, which will be one of the…

Kreate Group’s joint venture KFS Finland has completed the acquisition of NordPile Oy

KFS Finland Oy, which is equally owned by Kreate Group Plc and the global Keller Group plc, announced on 8 September 2021 that it has signed an agreement concerning the…

The Crown Bridges joint venture has signed the contract: the construction of Kruunuvuorensilta, the longest bridge in Finland, will begin in October

The Crown Bridges joint venture formed by Kreate and YIT has signed a contract with the City of Helsinki regarding the Crown Bridges project. The contract comprises the construction of…